Saudi Aramco - Marjan Field Expansion - Package 16 - Pipeline Installation from Tanajib GOSP to the Tanajib Concession Areas

The interlinked packages will form a pipeline infrastructure network being built as part of the Marjan Increment Program. The three packages will see the installation of pipelines from the main gas oil separation plant (GOSP) at Tanajib to the Jubail, Ras Tanura and Tanajib concession areas.

Saudi Aramco plans to develop its gas-driven fields such as Marjan offshore field. Marjan oil field delivers a high volume of associated gas and the new oil capacity will replace in time declines in oil capacity from other fields elsewhere.
Marjan is estimated to have the capacity to produce about 500,000 b/d of crude based on existing production facilities.

Saudi Aramco's extensive operations, both offshore and onshore are expected to maintain production on the mature gulf fields over the next decade as hundreds of new wells will be required to be drilled to support other operations in nearby oil fields.

Project Overview
Country Saudi Arabia
Location Marjan
Sector(s) Exploration & Upstream Production, Pipeline
Project Status Completed